CABLE CONDUCTOR JOINT

Photographic records of actual deviations identified during Electrical & ELV construction reviews.

Projects and construction participants are anonymised.

PHOTO RECORD / FACT

Electrical systems

EL-021 / CABLE CONDUCTOR JOINT

PRIORITY / MAJOR

OBSERVED

Cable conductors are joined outside a junction box, and the joint has no insulation.

RISK

Possible accidental contact with live parts after energisation, short circuit and damage to the line; the joint also lacks the intended mechanical protection.

WHAT TO CHECK

The cable circuit’s purpose and identification, the design solution, conductor joining method, insulation condition and intended location of the joint.

RECOMMENDED ACTION

Install a junction box, insulate the cable conductor joint and then close the junction box.

PRIORITY / MAJOR

Priority reflects an engineering assessment of the recorded condition in the circumstances of the particular project. It does not replace a designer’s opinion, testing or measurements where these are required.

These examples show the format of engineering records. The final assessment takes into account the design documentation, design solutions and conditions of the specific project.