← All findings
FACT → RISK → ACTION

CABLE PENETRATION

Photographic records of actual deviations identified during Electrical & ELV construction reviews.

Projects and construction participants are anonymised.

PHOTO RECORD / FACT

Electrical systems

EL-017 / CABLE PENETRATION

PRIORITY / MAJOR

OBSERVED

The cable penetration through the enclosing structure has not been fully sealed.

RISK

Water ingress through the penetration may affect cables and building structures, and require reopening and rework after subsequent work has been completed.

WHAT TO CHECK

The penetration design, sealing and waterproofing requirements, and whether the installation complies with the adopted technical solution.

RECOMMENDED ACTION

Do not carry out subsequent work that restricts access to the penetration until the design has been checked, the required sealing completed and the finished assembly reinspected.

PRIORITY / MAJOR

Priority reflects an engineering assessment of the recorded condition in the circumstances of the particular project. It does not replace a designer’s opinion, testing or measurements where these are required.

These examples show the format of engineering records. The final assessment takes into account the design documentation, design solutions and conditions of the specific project.