PHOTO RECORD / FACT

Electrical systems

EL-018 / CABLE LINE

PRIORITY / MAJOR

OBSERVED

Mechanical damage to the outer and inner insulation of cable products was recorded at the point of contact with the metal cable tray structure.

RISK

Loss of cable insulation integrity, reduced line reliability and the risk of further damage during operation.

WHAT TO CHECK

The extent of the cable damage, insulation integrity, the length of the affected section and whether continued operation is permissible.

RECOMMENDED ACTION

Prevent further mechanical impact on the cable. Inspect and assess the damaged section, determine the appropriate technical solution based on the findings, and verify that the issue has been resolved.

PRIORITY / MAJOR

Priority reflects an engineering assessment of the recorded condition in the circumstances of the particular project. It does not replace a designer’s opinion, testing or measurements where these are required.