LIGHTING / LUMINAIRE FIXING

Photographic records of actual deviations identified during Electrical & ELV construction reviews.

Projects and construction participants are anonymised.

PHOTO RECORD / FACT

Electrical systems

EL-022 / LIGHTING / LUMINAIRE FIXING

PRIORITY / MAJOR

OBSERVED

The luminaire is secured using plastic cable ties. The actual fixing method does not match the installation method specified by the manufacturer.

RISK

Insufficient reliability of the equipment fixing, with a possibility of movement or falling during operation.

WHAT TO CHECK

The manufacturer’s installation and fixing requirements, completeness of the specified fixing components, and the actual installation.

RECOMMENDED ACTION

Secure the luminaire using the method specified by the manufacturer, followed by verification of the installation’s mechanical reliability.

PRIORITY / MAJOR

Priority reflects an engineering assessment of the recorded condition in the circumstances of the particular project. It does not replace a designer’s opinion, testing or measurements where these are required.

These examples show the format of engineering records. The final assessment takes into account the design documentation, design solutions and conditions of the specific project.